Kitchener, Waterloo & nearby

Kitchen renovations in Kitchener-Waterloo

A good kitchen is mostly about how you move through it. Hipel Construction helps local homeowners decide what to keep, what to change and how the pieces fit together, from cabinets to lighting.

What a kitchen project can include

The parts of a kitchen worth deciding together.

L-shaped kitchen with an island and clear walkways to the sink and dining table
01

Layout and flow

The work triangle matters less than where people actually stand. Consider traffic from the door, the fridge and the table.

Ask about this
Open kitchen pantry and deep oak drawers holding pots, dishes and dry ingredients
02

Cabinetry and storage

Drawers or doors, full height or stopped short, pantry or none. Storage should match how you cook.

Ask about this
Quartz countertop, undermount sink and warm white tile kitchen backsplash
03

Countertops and backsplash

Material choice affects upkeep, durability and the look. Ask about edges, seams and sink cutouts.

Ask about this
Induction range and stainless range hood surrounded by oak cabinetry
04

Appliances and ventilation

Sizes, venting route and electrical or gas needs should be known before cabinets are ordered.

Ask about this
Kitchen corner with pendant and under-cabinet lighting above a tiled floor
05

Lighting and flooring

Layered lighting and a floor that handles spills turn a nice kitchen into an easy one.

Ask about this

Before you enquire

A little thinking goes a long way.

Kitchen island with preparation space and three stools beside a dining nook

Describe how you cook and gather

One cook or several? Baking, big meals, homework at the island? The answers decide counter space, seating and aisle width.

Refrigerator enclosure and built-in oven fitted into kitchen cabinetry

Know your appliance plan early

Appliance dimensions drive cabinet layout. A change late in the process can mean reworking cabinets, venting or services.

Temporary kitchen with a kettle and microwave beside renovation dust protection

Plan the disruption

Living without a kitchen takes thought. A temporary setup with a kettle, microwave and a washable corner helps everyone cope.

What shapes the budget

Layout changes
Moving sinks, ranges or walls affects plumbing, gas, electrical and finishing, not only cabinets.
Cabinet approach
Stock, semi-custom and custom cabinetry differ in lead time, options and overall scope.
Surface materials
Countertop and backsplash choices vary widely in scope and installation requirements.
Appliances and services
Larger ranges, hoods and built-ins can require new venting or electrical work.

What to have ready for a quote

  • Rough kitchen dimensions and photos
  • Appliances you plan to keep or replace
  • What you like and dislike about the current kitchen
  • Whether walls or the layout may change
  • Any must-have features

Planning timelines

How long does a kitchen project take?

From first enquiry to project start

Typically 4–8 weeks

Owner-approved enquiry-to-start is typically 4–8 weeks. Custom cabinetry lead times and any approvals can extend this.

Kitchen construction (illustrative)

Several weeks to a few months

A refresh with existing layout is generally shorter. A full layout change is longer. This is not a promised schedule.

These are broad, illustrative planning ranges, not promised schedules. Enquiry-to-start is typically 4–8 weeks, but approvals, additions and special-order materials can take longer. Your project-specific start date and construction plan should be confirmed before work begins.

Design choices

Details that make the space work better.

Kitchen pull-out corner cabinet and fitted drawer organizers beside an island
Practical cabinet interiors
Drawer stacks, pull-outs and divided storage can make everyday items easier to reach. Plan them around how you cook rather than only cabinet appearance.
An island with a purpose
Decide whether an island is for preparation, seating or storage. Check appliance-door movement and circulation before committing to its size.
Layered lighting
Discuss under-cabinet task lights, general lighting and pendants together. Include switching and electrical requirements in the plan.
Surfaces for daily life
Compare countertop care, backsplash cleaning and flooring suitability alongside colour. Product selection should reflect use and maintenance preferences.

The people behind Hipel

Real people behind your project.

Hipel Construction was founded by Kadison Hipel and Jayden following their success with Hipel Pools. Since 2018, their work at Hipel Pools has included more than 250 pools and outdoor living spaces. That background in coordinating construction projects is the foundation for Hipel Construction.

Let’s talk about your kitchen
  • Portrait of Kadison Hipel
    Kadison HipelPresident
  • Portrait of Jayden
    JaydenCo-Founder
  • Portrait of Nathan
    NathanConstruction Foreman
  • Portrait of Dylan
    DylanConstruction Lead Hand

How it works

From first call to finished space.

Begin with your kitchen
  1. 01

    Share your kitchen and your habits

    Tell us the town, the size and what you would like to change.

  2. 02

    Measure and discuss the layout

    Review the room, services and appliance needs, then talk through layout options.

  3. 03

    Select cabinets and surfaces

    Confirm selections, lead times and who orders what before demolition.

  4. 04

    Remove, rough-in and install

    Demolition, any services work, cabinetry, countertops, backsplash and fixtures follow in sequence.

  5. 05

    Finish and review

    Adjust doors and drawers, review care and confirm any remaining items.

Service areaSouthwestern Ontario
Hipel Construction service area mapMap showing all seven Waterloo Region municipalities and full boundaries of Centre Wellington, Guelph/Eramosa, Guelph, and Puslinch. Location markers highlight Elmira, St. Jacobs, Baden, New Hamburg, Ayr, Wellesley, Breslau, Heidelberg, and Conestogo in Waterloo Region, plus Fergus, Elora, Guelph, Rockwood, and Puslinch.Centre Wellington — full municipal boundaryGuelph/Eramosa — full municipal boundaryGuelph — full municipal boundaryPuslinch Township — full municipal boundary
Waterloo Region · all 7 municipalitiesCentre Wellington, Guelph/Eramosa, Guelph & PuslinchDots mark local communities

Full township borders shown. Fergus & Elora are in Centre Wellington; Rockwood is in Guelph/Eramosa.

Map boundaries and locations: © OpenStreetMap contributors

Local coverage

Kitchener, Waterloo and the neighbours around them.

We serve all seven Waterloo Region municipalities—Cambridge, Kitchener, Waterloo, North Dumfries, Wellesley, Wilmot, and Woolwich—plus Fergus, Elora, Guelph, Rockwood, and Puslinch.

Talk about your kitchen

Kitchens questions.

Can I keep my existing layout and still refresh the kitchen?

Yes. Keeping sinks and appliances in place often simplifies the work, and new cabinet fronts, surfaces and lighting can still change the room a lot.

Should I choose appliances first?

It helps. Cabinet openings, venting and power depend on appliance dimensions, so having them in mind avoids rework.

Can you move a sink or range?

Often yes, but it affects plumbing, gas or electrical work. Raise it early so the plan reflects it.

Will I have to move out?

Most families stay. Plan a temporary kitchen, dust protection and a clear path through the house.

Do I need a permit?

Cosmetic changes often do not, but gas, electrical, plumbing and structural changes may. Check with your municipality.

How do I choose a countertop?

Think about how you cook, how much upkeep you want and how the material looks with your cabinets and floors. Samples in your own light help.

What causes delays?

Special-order cabinetry or appliances, hidden conditions found behind walls, and late selection changes are the usual causes.

How long does a kitchen take?

Enquiry to start is typically 4–8 weeks once you approve, and construction time varies broadly with scope. We do not promise fixed dates before the plan is confirmed.

Your next step

Tell us about your kitchen.

Share your town and what you would like to change. Complete the form below without leaving this page, or use the button to open our dedicated quote page.

Request a quote

Let’s talk about your home

Request a quote

Tell us what you have in mind. Your enquiry goes straight to our team.

Rooms & services (required)

Select all that apply. Choose at least one.

Project photos (optional)

Up to 3 JPEG or PNG photos, 5 MB each. Photos are shared privately with our team alongside your enquiry.